Most photographs of downtown Duluth will also capture the Aerial Bridge, and so it is with this image of Superior Street at Fifth Avenue West. The Spalding hotel was completed in June 1889. It was razed in the summer of 1963 along with many other buildings in the Gateway Renewal Project. The total cost of razing Gateway buildings was $258,000, including demolition of the Spalding hotel at the cost of $43,500.
Contributing Institution:
University of Minnesota Duluth, Kathryn A. Martin Library, Northeast Minnesota Historical Collections
This photograph may have been shot from Seventh Street and about Lake Avenue. The bright narrow strip in the lower middle of the image is Lake Avenue leading to the Aerial Bridge. The rectangle and three dots parallel to the piers of the canal are the remnants of the Whitney rock crushing enterprise. The Whitney Brothers, of Superior, Wisconsin, had a sand and gravel processing business that was functioning in 1919. The concrete form that is still in the water was the dredging/crushing building. A tunnel ran from the building to the Point. There was a conveyor belt and railroad spur adjacent to the concrete building. Sand from the Apostle Islands and gravel from Grand Marais were carried to Duluth on a small vessel named Limit. The business also used a tug the William A. Whitney. The Limit was secured to the concrete building and the load of sand or gravel was unloaded into the steel hopper using a jaw-like clam shell, steam powered device. The belt conveyed the materials to shore and it dropped into a tunnel where trucks were ready. On Federal lake charts it is referred to as cribs. Telephone lines are in this photograph. In 1880, the first telephones were installed in Duluth by Walter Van Brunt for C. H. Graves and Company. In 1881, the Duluth Telephone Company was incorporated with $10,000 capital. In 1882, the first telephone directory was issued for 30 subscribers. In 1898, long distance lines between Duluth, Cloquet and Carlton were strung. In 1899, Duluth had 794 telephones. In 1900, the Zenith telephone Company (independent) started operations in competition with Duluth Telephone Company. The tower is the Central High School clock tower. The 1892 school has been the Central Administration Building for ISD 709 since the late 1970s.
Contributing Institution:
University of Minnesota Duluth, Kathryn A. Martin Library, Northeast Minnesota Historical Collections
The Chicago Shipbuilding Company of Chicago, a subsidiary of the American Shipbuilding Company, built the steamer William E. Cory for the Pittsburgh Steamship Company in 1904. The vessel dimensions are 569' X 56' X 31'. She sailed from Chicago on her maiden voyage August 12, 1905 bound for Duluth to load iron ore. The aerial bridge was new. Bids were opened March 25, 1901, but only one was received. The Duluth Canal Bridge Company was awarded the contract but abandoned the work. In February 1904, the Modern Steel Structural Company of Waukesha, Wisconsin was issued a contract. Work began July 20, 1904. On February 23, 1905, with local dignitaries at hand, the bridge was first operated. Regular service began the next day according to newspaper accounts. The city engineer's report for 1905 stated that the bridge was "completed and commenced operation on May 5, 1905, and a few problems were corrected in running the bridge over the next few days." The Aerial bridge was completed in February 1905. The aerial bridge transporter or gondola or transfer car roadway was 17 feet by 50 feet with sidewalks seven feet by 50 feet, the cabins were 30 feet long. The U.S. Army Corps of Engineers office building with flag above it was built in 1906. Also visible in the image are the National Biscuit Company 517 Lake Avenue South, Blanchet Hotel 520 Lake Avenue South, and Wieland Flats 502-512 St. Croix Avenue
Contributing Institution:
University of Minnesota Duluth, Kathryn A. Martin Library, Northeast Minnesota Historical Collections
On Monday, July 1, 1929, the suspended car made its last trip across the canal. The bridge's modification to operate with a lift span began on April 8, 1929, with a low bid of $448,000 by the Kansas City Bridge Company. The Aerial Lift Bridge was first operated on March 19, 1930. The bridge has a clearance of 138 feet when the lift section is completely up and when down it is 16.5 feet above the water. The length of the span is 386 feet and weighs 900 tons. The distance from the water to the lower edge of the truss is 172 feet 7 inches; to the top of the truss it is 227 feet. During the shipping season it makes about 25 lifts a day. The new bridge is owned and operated by the City of Duluth on permit authorized by Congress. The Ship Canal and grounds are under the authority of the Lake Superior Area Office of the U.S. Army Corps of Engineers.
Contributing Institution:
University of Minnesota Duluth, Kathryn A. Martin Library, Northeast Minnesota Historical Collections
This view shows Canal Park in the right foreground and downtown Duluth behind. The railroad tracks are parallel to Superior Street and will be displaced by the I35 freeway. The flat, undeveloped areas west or to the left of the Arena-Auditorium will later become the site for Playfront Park, Bayfront Festival Park, and the Great Lakes Aquarium. In this photo, Canal Park's recent addition is the 1973 Marine Museum adjacent to the 1906 U.S. Army Corps of Engineers Building. Both are near the base of the North tower of the aerial lift bridge. In the middle of this view is the Arena Auditorium (opened in 1966) that will later to added to and renamed the DECC in 1987. To its right is the rectangular Pioneer Hall. Ground was broken on April 7, 1975, for the Pioneer Hall and Duluth Curling Club. It is a world-class curling facility. The Silver Broom World Curling Tournament in March 1976, drew 41,000 fans from ten countries to the new ice sheets. Grand opening celebrations were held August 30 to September 12, 1976. The Northwest Passage, a skywalk from downtown to the Arena-Auditorium through the Pioneer Hall, will be completed in 1976.
Contributing Institution:
University of Minnesota Duluth, Kathryn A. Martin Library, Northeast Minnesota Historical Collections
The area west of the Arena Auditorium occupied here by hundreds of parked RVs will be developed into Bay Front Park. In the summer of 1983, an Airstream rally occupied all of the Arena Auditorium parking lot and the area seen here taken by RVs. The dark rectangular building near the stern of the ore boat is the Flame Restaurant building. The slip at the far right will be filled. In the foreground the I35 freeway is under construction and building materials laid out to the right. the Ship Canal piers were being remodeled/rehabilitated in 1985-1986.
Contributing Institution:
University of Minnesota Duluth, Kathryn A. Martin Library, Northeast Minnesota Historical Collections